This machine forms a 60-centimetre wide concrete slab along the entire surface area of the stainless steel belt.
The thickness of the slab can vary between 30 and 60 millimetres. This is how we control its quantities in the first layer, as the cost depends on the type of stones that we want to be seen once the process has finished.
This machine responds to the commands sent by the Plotter. The concrete slab is laid out according to the geometry of the slab. |